Triple

T13712355
Position Surface form Disambiguated ID Type / Status
Subject Central Tamil Nadu E328804 entity
Predicate hasMajorCity P316 FINISHED
Object Karur E338524 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Karur | Statement: [Central Tamil Nadu, hasMajorCity, Karur]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Karur
Context triple: [Central Tamil Nadu, hasMajorCity, Karur]
  • A. Karur chosen
    Karur is a town in the Indian state of Tamil Nadu known as an important textile, bus body building, and industrial center on the banks of the Amaravathi River.
  • B. Erode
    Erode is a major city in the South Indian state of Tamil Nadu, known as a textile and turmeric trading hub on the banks of the Kaveri River.
  • C. Sholinghur
    Sholinghur is a historic town in Tamil Nadu, India, known for its role in 18th-century Anglo-Mysore conflicts and its prominent hilltop temples.
  • D. Mudukulathur
    Mudukulathur is a town in the Ramanathapuram district of Tamil Nadu, India, known for its role as a local administrative and commercial center.
  • E. Kollur
    Kollur is a village in Karnataka, India, best known for the Mookambika Temple, a major Hindu pilgrimage destination.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d80770b9bc81909f70c8c317d53cff completed April 9, 2026, 8:09 p.m.
NER Named-entity recognition batch_69dd4395e8c0819098719c8cd344aa33 completed April 13, 2026, 7:27 p.m.
NED1 Entity disambiguation (via context triple) batch_69fcdeed4548819082038c5b88ccd212 completed May 7, 2026, 6:50 p.m.
Created at: April 9, 2026, 9:54 p.m.