Triple
T13693653
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Barker Slough |
E328330
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | tidal freshwater channel |
C10964
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: tidal freshwater channel Context triple: [Barker Slough, instanceOf, tidal freshwater channel]
-
A.
tidal creek
chosen
A tidal creek is a narrow, shallow waterway in coastal or estuarine areas whose flow and water level are strongly influenced by the rise and fall of the tides.
-
B.
tidal inlet
A tidal inlet is a narrow coastal waterway that connects the open sea with bays, lagoons, or estuaries, allowing tidal waters to flow in and out.
-
C.
estuary
An estuary is a coastal water body where freshwater from rivers and streams mixes with saltwater from the ocean, creating a dynamic and nutrient-rich environment.
-
D.
river distributary
A river distributary is a branch of a river that diverges from the main channel and flows away from it, typically found in delta regions where sediment deposition causes the river to split into multiple smaller channels.
-
E.
drainage channel
A drainage channel is a constructed or natural linear feature designed to collect and convey excess surface or subsurface water away from an area to prevent flooding, erosion, or waterlogging.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8076ff62081908a7bd79889edd7a0 |
completed | April 9, 2026, 8:09 p.m. |
Created at: April 9, 2026, 9:54 p.m.