Triple

T1363774
Position Surface form Disambiguated ID Type / Status
Subject East Tennessee Technology Park E29155 entity
Predicate closedAsEnrichmentPlant P27480 FINISHED
Object 1985 LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 1985 | Statement: [East Tennessee Technology Park, closedAsEnrichmentPlant, 1985]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: closedAsEnrichmentPlant
Context triple: [East Tennessee Technology Park, closedAsEnrichmentPlant, 1985]
  • A. closedUnder
    Indicates that applying a specified operation to elements within a set always produces a result that is also an element of that same set.
  • B. closedIn
    Indicates that one entity is enclosed, contained, or surrounded within the boundaries or limits defined by another entity.
  • C. closed
    Indicates that an entity has brought something (such as an object, container, or space) from an open state into a shut or sealed state, or that it is currently in that shut state.
  • D. closedBy
    Indicates that one entity performs the action of closing, finishing, or terminating another entity (such as a task, issue, or process).
  • E. closureProcess
    Indicates the procedure or set of actions carried out to formally conclude, finalize, or terminate an ongoing activity, case, or process.
  • F. None of above. chosen

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a498d77abc8190913bf57e5f51d2c4 completed March 1, 2026, 7:51 p.m.
NER Named-entity recognition batch_69a4c2b5d05c81908b49e282648e073a completed March 1, 2026, 10:50 p.m.
PD Predicate disambiguation batch_69a4bef945c08190a027472fdd695ea5 completed March 1, 2026, 10:34 p.m.
PDg Predicate description generation batch_69a4c06721488190ac7f6e012f21af3d completed March 1, 2026, 10:40 p.m.
Created at: March 1, 2026, 7:57 p.m.