Triple
T1363747
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | East Tennessee Technology Park |
E29155
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | former uranium enrichment plant |
C5370
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: former uranium enrichment plant Context triple: [East Tennessee Technology Park, instanceOf, former uranium enrichment plant]
-
A.
weapons-grade plutonium production facility
A weapons-grade plutonium production facility is an industrial complex designed to produce, extract, and process plutonium with isotopic compositions suitable for use in nuclear weapons.
-
B.
former industrial plant
chosen
A former industrial plant is a decommissioned facility that once housed large-scale manufacturing or processing operations, often leaving behind substantial physical infrastructure and potential environmental impacts.
-
C.
plutonium production reactor
A plutonium production reactor is a nuclear reactor specifically designed and operated to irradiate uranium fuel and efficiently generate plutonium-239 for use in nuclear weapons or reactor fuel.
-
D.
industrial plant
An industrial plant is a large-scale facility where raw materials are transformed through mechanical, chemical, or biological processes into finished or semi-finished products using specialized equipment and coordinated operations.
-
E.
former United States Mint facility
A former United States Mint facility is a decommissioned government building that once produced or processed U.S. coinage and related monetary materials but is no longer in active minting operation.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a498d77abc8190913bf57e5f51d2c4 |
completed | March 1, 2026, 7:51 p.m. |
Created at: March 1, 2026, 7:57 p.m.