Triple
T13548460
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | former Cambridge and St Ives railway line |
E323577
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | disused railway |
C3106
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: disused railway Context triple: [former Cambridge and St Ives railway line, instanceOf, disused railway]
-
A.
defunct railroad
chosen
A defunct railroad is a former railway company or line that has ceased operations, often leaving behind abandoned tracks, rights-of-way, or repurposed infrastructure.
-
B.
former railway facility
A former railway facility is a decommissioned or repurposed site that once served operational functions for rail transport, such as stations, depots, yards, or maintenance buildings.
-
C.
funeral railway
A funeral railway is a specialized rail transport system designed to convey the deceased, mourners, and funerary staff between urban areas and cemeteries or burial grounds.
-
D.
former railway station
A former railway station is a decommissioned train facility that once served passengers or freight but is no longer in active railway use.
-
E.
railway line
A railway line is a fixed transportation route consisting of tracks, signaling, and related infrastructure along which trains operate between defined locations.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8076776248190bdf0d4fa1f85a5fc |
completed | April 9, 2026, 8:09 p.m. |
Created at: April 9, 2026, 9:45 p.m.