Triple

T13538580
Position Surface form Disambiguated ID Type / Status
Subject PPE (Power and Propulsion Element) E323323 entity
Predicate instanceOf P0 FINISHED
Object power and propulsion module C31816 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: power and propulsion module
Context triple: [PPE (Power and Propulsion Element), instanceOf, power and propulsion module]
  • A. spacecraft power system
    A spacecraft power system is the integrated set of components and subsystems that generate, store, condition, and distribute electrical energy to support all spacecraft functions throughout its mission.
  • B. astronaut propulsion system
    An astronaut propulsion system is a compact, controllable device that enables astronauts to maneuver independently in space by generating thrust through expelled propellant or alternative reaction-mass technologies.
  • C. spacecraft service module chosen
    A spacecraft service module is the section of a spacecraft that houses and provides essential support systems—such as propulsion, power, thermal control, and consumables—to enable and sustain the operation of the crew or payload module.
  • D. nuclear pulse propulsion system
    A nuclear pulse propulsion system is a spacecraft propulsion method that generates thrust by detonating a series of small nuclear explosives behind the vehicle and transferring the resulting impulse through a robust pusher plate and shock-absorbing structure.
  • E. ablative thermal protection system
    An ablative thermal protection system is a heat shield that protects a spacecraft by sacrificially charring, melting, and eroding material to absorb and carry away extreme reentry heat.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8076776248190bdf0d4fa1f85a5fc completed April 9, 2026, 8:09 p.m.
Created at: April 9, 2026, 9:45 p.m.