Triple
T13538437
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | LOP-G |
E323320
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | space infrastructure project |
C33183
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: space infrastructure project Context triple: [LOP-G, instanceOf, space infrastructure project]
-
A.
space communication project
A space communication project is an organized effort to design, develop, and operate systems that enable reliable data and signal exchange between spacecraft, satellites, and ground stations.
-
B.
space art project
A space art project is a creative endeavor that uses themes, materials, or environments related to outer space to produce artistic expressions or experiences.
-
C.
space mission
A space mission is a planned and coordinated endeavor to send spacecraft, instruments, or humans beyond Earth's atmosphere to achieve specific scientific, exploratory, commercial, or technological objectives.
-
D.
space technology
Space technology encompasses the tools, systems, and methods used to explore, utilize, and operate in outer space, including spacecraft, satellites, launch vehicles, and supporting ground infrastructure.
-
E.
space technology
Space technology encompasses the tools, systems, and methods developed to explore, utilize, and operate in outer space, including spacecraft, satellites, launch vehicles, and supporting ground infrastructure.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8076776248190bdf0d4fa1f85a5fc |
completed | April 9, 2026, 8:09 p.m. |
Created at: April 9, 2026, 9:45 p.m.