Triple

T13530802
Position Surface form Disambiguated ID Type / Status
Subject Operation Market E323126 entity
Predicate instanceOf P0 FINISHED
Object component of Operation Market Garden C33168 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: component of Operation Market Garden
Context triple: [Operation Market, instanceOf, component of Operation Market Garden]
  • A. World War II supply line
    A World War II supply line is the network of transportation routes, logistics operations, and support infrastructure used to move troops, equipment, fuel, and provisions to and from battlefronts during the war.
  • B. World War II commando raid
    A World War II commando raid is a small-scale, highly planned military operation conducted by specially trained troops to infiltrate enemy territory, achieve a specific tactical or strategic objective, and withdraw quickly, often relying on surprise and stealth.
  • C. component of Liberation
    A component of Liberation is a distinct element—such as a practice, condition, or realization—that contributes essentially to the process or state of becoming free from constraint, oppression, or limitation.
  • D. Nazi military operation
    A Nazi military operation is a planned and coordinated action conducted by the armed forces of Nazi Germany to achieve specific strategic, tactical, or political objectives during its period of rule, particularly in World War II.
  • E. World War II resistance operation
    A World War II resistance operation is a covert, organized action conducted by underground groups in occupied territories to sabotage enemy forces, gather intelligence, and support Allied war efforts.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d80766a21881909f21a1b7421d3b8a completed April 9, 2026, 8:09 p.m.
Created at: April 9, 2026, 9:44 p.m.