Triple

T13428493
Position Surface form Disambiguated ID Type / Status
Subject Tai Dam language E313544 entity
Predicate hasAutonym P1435 FINISHED
Object Tai Dam E778458 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Tai Dam | Statement: [Tai Dam language, hasAutonym, Tai Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Tai Dam
Context triple: [Tai Dam language, hasAutonym, Tai Dam]
  • A. Tai Dam chosen
    The Tai Dam are a Tai ethnic group originating from Southeast Asia, known for their distinct Black Tai cultural identity, language, and traditional textiles, with communities primarily in Vietnam, Laos, Thailand, and the diaspora.
  • B. Đa Nhim Dam
    Đa Nhim Dam is a major hydroelectric dam in Vietnam that harnesses the waters of the Đồng Nai River to generate power and support regional water management.
  • C. Umiam Dam
    Umiam Dam is a major hydroelectric and water storage dam in Meghalaya, India, that created the scenic Umiam Lake and supports regional power generation, irrigation, and tourism.
  • D. Tilaiya Dam
    Tilaiya Dam is a multipurpose masonry dam in Jharkhand, India, built as part of the Damodar Valley Corporation project to provide hydroelectric power, irrigation, and flood control.
  • E. Tantangara Dam
    Tantangara Dam is a major concrete gravity dam in New South Wales, Australia, built as part of the Snowy Mountains Scheme to store water for hydroelectric power generation and irrigation.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d806ad0c44819088833ae1ec9e9690 completed April 9, 2026, 8:06 p.m.
NER Named-entity recognition batch_69dbaed1f9208190bf5ef5b8a7ded376 completed April 12, 2026, 2:40 p.m.
NED1 Entity disambiguation (via context triple) batch_69f730883cb48190add9469c48dc3e89 completed May 3, 2026, 11:24 a.m.
Created at: April 9, 2026, 9:40 p.m.