Triple
T13423357
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Seglora Church |
E313414
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | relocated building |
C6314
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: relocated building Context triple: [Seglora Church, instanceOf, relocated building]
-
A.
relocated monument
chosen
A relocated monument is a commemorative structure that has been physically moved from its original site to a new location while retaining its historical, cultural, or symbolic significance.
-
B.
revitalized historic building
A revitalized historic building is a preserved architectural structure that has been thoughtfully restored and modernized to serve contemporary functions while maintaining its original character and cultural significance.
-
C.
building
A building is a constructed, often multi-level structure designed to provide shelter, space, and functional environments for human activities such as living, working, or storing goods.
-
D.
former hospital building
A former hospital building is a structure that once functioned as a medical care facility but has since been closed, repurposed, or left vacant.
-
E.
building section
A building section is a vertical cut-through representation of a structure that reveals its internal arrangement, construction elements, and spatial relationships from foundation to roof.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d806ad0c44819088833ae1ec9e9690 |
completed | April 9, 2026, 8:06 p.m. |
Created at: April 9, 2026, 9:39 p.m.