Triple

T1338404
Position Surface form Disambiguated ID Type / Status
Subject OV-chipkaart E28408 entity
Predicate nationwideRolloutCompleted P1574 FINISHED
Object 2011 LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 2011 | Statement: [OV-chipkaart, nationwideRolloutCompleted, 2011]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: nationwideRolloutCompleted
Context triple: [OV-chipkaart, nationwideRolloutCompleted, 2011]
  • A. launchOutcome
    Indicates the result or consequence of a launch event, such as whether it succeeded, failed, or had a specific status or outcome.
  • B. implementationStatus
    Indicates the current state or progress of carrying out or realizing something, such as a plan, design, or requirement.
  • C. conversionCompleted
    Indicates that a previously initiated conversion process has finished successfully.
  • D. completedIn chosen
    Indicates that an action, process, or task was fully finished within a specified time period or duration.
  • E. installationCompleted
    Indicates that the process of installing something has finished successfully.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a49854eb3481908c7d56b2e449a290 completed March 1, 2026, 7:49 p.m.
NER Named-entity recognition batch_69a4c2115d388190b031ae2de1296f8a completed March 1, 2026, 10:47 p.m.
PD Predicate disambiguation batch_69a4bef174708190a07bbc697fe19a2d completed March 1, 2026, 10:34 p.m.
Created at: March 1, 2026, 7:56 p.m.