Triple

T13336582
Position Surface form Disambiguated ID Type / Status
Subject Tuusula E317708 entity
Predicate hasTransportConnection P845 FINISHED
Object Helsinki–Lahti motorway E690400 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Helsinki–Lahti motorway | Statement: [Tuusula, hasTransportConnection, Helsinki–Lahti motorway]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Helsinki–Lahti motorway
Context triple: [Tuusula, hasTransportConnection, Helsinki–Lahti motorway]
  • A. O-3 motorway
    The O-3 motorway is a major Turkish highway in European Thrace that forms part of the main road connection between Istanbul and the western border with Europe.
  • B. C-32 motorway
    The C-32 motorway is a major Spanish highway in Catalonia that runs along the Mediterranean coast, linking Barcelona with key coastal towns and tourist areas.
  • C. Länsiväylä highway
    Länsiväylä highway is a major Finnish motorway that connects central Helsinki with its western suburbs and the city of Espoo.
  • D. E25 motorway
    The E25 motorway is a major European route running from the Netherlands through Belgium and Luxembourg to southern France, forming part of a key north–south transport corridor.
  • E. E18 motorway chosen
    The E18 motorway is a major European route running across parts of the United Kingdom and Scandinavia, serving as a key east–west transport corridor in northern Europe.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d806b5a3c08190b42c267fb092f98a completed April 9, 2026, 8:06 p.m.
NER Named-entity recognition batch_69d99d00b75c8190af98784c7df904c8 completed April 11, 2026, 12:59 a.m.
NED1 Entity disambiguation (via context triple) batch_69f71f39f298819088d79cda3ac2b375 completed May 3, 2026, 10:11 a.m.
Created at: April 9, 2026, 9:31 p.m.