Triple

T1330111
Position Surface form Disambiguated ID Type / Status
Subject Segway PT E28622 entity
Predicate instanceOf P0 FINISHED
Object two-wheeled vehicle C6452 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: two-wheeled vehicle
Context triple: [Segway PT, instanceOf, two-wheeled vehicle]
  • A. light utility vehicle
    A light utility vehicle is a small, versatile motor vehicle designed to transport people, light cargo, or equipment, often with off-road or multi-terrain capability.
  • B. twin‑engine aircraft
    A twin-engine aircraft is an airplane equipped with two engines, typically mounted on the wings or fuselage, providing increased power, redundancy, and safety compared to single-engine designs.
  • C. sport utility vehicle
    A sport utility vehicle is a versatile passenger vehicle that combines elements of on-road cars and off-road trucks, typically offering higher ground clearance, spacious interiors, and optional all-wheel or four-wheel drive for varied driving conditions.
  • D. vehicle ferry
    A vehicle ferry is a boat or ship designed to transport cars, trucks, and other vehicles, along with their passengers, across bodies of water.
  • E. armoured fighting vehicle
    An armoured fighting vehicle is a heavily protected, mobile combat platform—typically tracked or wheeled—designed to engage enemy forces using integrated weapons systems on the battlefield.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a498561a508190a3e1bc137c2b866a completed March 1, 2026, 7:49 p.m.
Created at: March 1, 2026, 7:55 p.m.