Triple

T1316421
Position Surface form Disambiguated ID Type / Status
Subject Metropolitan Planning Organizations in Georgia E28113 entity
Predicate includes P1393 FINISHED
Object Brunswick Area Transportation Study MPO
The Brunswick Area Transportation Study MPO is a regional planning organization responsible for coordinating long-range transportation planning and investment decisions in the Brunswick, Georgia metropolitan area.
E151579 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Brunswick Area Transportation Study MPO | Statement: [Metropolitan Planning Organizations in Georgia, includes, Brunswick Area Transportation Study MPO]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Brunswick Area Transportation Study MPO
Context triple: [Metropolitan Planning Organizations in Georgia, includes, Brunswick Area Transportation Study MPO]
  • A. Macon Area Transportation Study MPO
    The Macon Area Transportation Study MPO is a regional planning body responsible for coordinating long-range transportation planning and investment decisions in the greater Macon, Georgia area.
  • B. Rome-Floyd County MPO
    The Rome-Floyd County MPO is a regional transportation planning agency responsible for coordinating long-range transportation strategies and funding for the Rome and Floyd County area in Georgia.
  • C. Brockton Area Transit Authority
    Brockton Area Transit Authority is the public transportation agency that operates local and regional bus services in and around Brockton, Massachusetts.
  • D. Valdosta-Lowndes Metropolitan Planning Organization
    The Valdosta-Lowndes Metropolitan Planning Organization is a regional body responsible for coordinating long-range transportation planning and funding for the Valdosta-Lowndes County urbanized area in Georgia.
  • E. Transit Bureau
    The Transit Bureau is the division of the New York City Police Department responsible for policing and ensuring safety within the city’s public transit system, particularly the subway.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Brunswick Area Transportation Study MPO
Triple: [Metropolitan Planning Organizations in Georgia, includes, Brunswick Area Transportation Study MPO]
Generated description
The Brunswick Area Transportation Study MPO is a regional planning organization responsible for coordinating long-range transportation planning and investment decisions in the Brunswick, Georgia metropolitan area.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Brunswick Area Transportation Study MPO
Target entity description: The Brunswick Area Transportation Study MPO is a regional planning organization responsible for coordinating long-range transportation planning and investment decisions in the Brunswick, Georgia metropolitan area.
  • A. Macon Area Transportation Study MPO
    The Macon Area Transportation Study MPO is a regional planning body responsible for coordinating long-range transportation planning and investment decisions in the greater Macon, Georgia area.
  • B. Rome-Floyd County MPO
    The Rome-Floyd County MPO is a regional transportation planning agency responsible for coordinating long-range transportation strategies and funding for the Rome and Floyd County area in Georgia.
  • C. Brockton Area Transit Authority
    Brockton Area Transit Authority is the public transportation agency that operates local and regional bus services in and around Brockton, Massachusetts.
  • D. Valdosta-Lowndes Metropolitan Planning Organization
    The Valdosta-Lowndes Metropolitan Planning Organization is a regional body responsible for coordinating long-range transportation planning and funding for the Valdosta-Lowndes County urbanized area in Georgia.
  • E. Transit Bureau
    The Transit Bureau is the division of the New York City Police Department responsible for policing and ensuring safety within the city’s public transit system, particularly the subway.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a498532c3481909223b74af2e578df completed March 1, 2026, 7:49 p.m.
NER Named-entity recognition batch_69a4c175079481909077cf11ed72d6fa completed March 1, 2026, 10:45 p.m.
NED1 Entity disambiguation (via context triple) batch_69acbf2964048190950723487c7cf707 completed March 8, 2026, 12:13 a.m.
NEDg Description generation batch_69acbfc03f20819089a025fc745c9203 completed March 8, 2026, 12:16 a.m.
NED2 Entity disambiguation (via description) batch_69acc0282080819087676813c2852a96 completed March 8, 2026, 12:17 a.m.
Created at: March 1, 2026, 7:55 p.m.