Triple

T1311295
Position Surface form Disambiguated ID Type / Status
Subject Metra Union Pacific West Line E27995 entity
Predicate endPoint P390 FINISHED
Object Elburn station E178413 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Elburn station | Statement: [Metra Union Pacific West Line, endPoint, Elburn station]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Elburn station
Context triple: [Metra Union Pacific West Line, endPoint, Elburn station]
  • A. Elburn station chosen
    Elburn station is a commuter rail station in Elburn, Illinois, serving as the western endpoint of Metra’s Union Pacific West Line to Chicago.
  • B. Naperville station
    Naperville station is a commuter rail station in Naperville, Illinois, serving as a major stop for Metra and Amtrak trains in the western suburbs of Chicago.
  • C. Hinsdale station
    Hinsdale station is a historic commuter rail stop in Hinsdale, Illinois, serving passengers on Metra’s BNSF Railway Line between Chicago and its western suburbs.
  • D. Berwyn station
    Berwyn station is a commuter rail stop in Berwyn, Illinois, served by Metra trains on the BNSF Railway Line connecting the suburb to downtown Chicago.
  • E. Dempster–Skokie station
    Dempster–Skokie station is a Chicago Transit Authority rapid transit station in Skokie, Illinois, serving as the northern endpoint of the Yellow Line and a key park-and-ride hub for commuters.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a496d7d83481908f83085854e51328 completed March 1, 2026, 7:43 p.m.
NER Named-entity recognition batch_69a4c1560f888190bdd9107b08395e0b completed March 1, 2026, 10:44 p.m.
NED1 Entity disambiguation (via context triple) batch_69ad51996dc08190afecb40095e3d3e2 completed March 8, 2026, 10:38 a.m.
Created at: March 1, 2026, 7:51 p.m.