Triple

T13098006
Position Surface form Disambiguated ID Type / Status
Subject Rio Metro Regional Transit District E310639 entity
Predicate railLineOperated P848 FINISHED
Object New Mexico Rail Runner Express main line E59495 NE FINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: New Mexico Rail Runner Express main line | Statement: [Rio Metro Regional Transit District, railLineOperated, New Mexico Rail Runner Express main line]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: New Mexico Rail Runner Express main line
Context triple: [Rio Metro Regional Transit District, railLineOperated, New Mexico Rail Runner Express main line]
  • A. New Mexico Rail Runner Express chosen
    The New Mexico Rail Runner Express is a commuter rail service that connects major cities and communities in central New Mexico, including Albuquerque and Santa Fe.
  • B. Albuquerque–Santa Fe corridor
    The Albuquerque–Santa Fe corridor is a major urban and transportation region in central New Mexico linking the state’s largest city, Albuquerque, with its capital, Santa Fe, along the Rio Grande.
  • C. Burlington Northern Santa Fe Railway main line
    The Burlington Northern Santa Fe Railway main line is a major transcontinental freight rail corridor in the United States that carries heavy rail traffic across key western routes, including the desert region near Needles, California.
  • D. Santa Fe main line via New Mexico
    Santa Fe main line via New Mexico is a principal stretch of the Atchison, Topeka and Santa Fe Railway’s transcontinental route that crosses New Mexico, historically used by premier passenger trains like the Super Chief.
  • E. BNSF La Junta Subdivision
    BNSF La Junta Subdivision is a major freight and passenger rail line in the BNSF Railway network running through southeastern Colorado and surrounding regions.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: railLineOperated
Context triple: [Rio Metro Regional Transit District, railLineOperated, New Mexico Rail Runner Express main line]
  • A. railFranchise
    Indicates a contractual relationship in which a company is granted the right to operate rail services or manage rail infrastructure within a specified area or route.
  • B. operatesRailLinesOnIsland
    Indicates that a railway operator runs or manages rail lines located on a specific island.
  • C. railwayLine chosen
    Indicates that there is a railway line connection or route associated with or passing through the referenced entity.
  • D. railLineOrigin
    Indicates that a rail line begins or originates from a specified location or point.
  • E. railwayLineNow
    Indicates that a previously existing railway line has been replaced, succeeded, or is currently represented by a new or different railway line.
  • F. None of above.

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d806a733548190989cfd4ce981ca33 completed April 9, 2026, 8:05 p.m.
NER Named-entity recognition batch_69d981500d34819097037b3c3c33627b completed April 10, 2026, 11:01 p.m.
NED1 Entity disambiguation (via context triple) batch_69f75469a3f08190a7e417872147b455 completed May 3, 2026, 1:58 p.m.
PD Predicate disambiguation batch_69d9803f6c508190bfadfbc2d00c2c64 completed April 10, 2026, 10:57 p.m.
Created at: April 9, 2026, 9:04 p.m.