Triple

T13044651
Position Surface form Disambiguated ID Type / Status
Subject Hatfield, Yorkshire E327285 entity
Predicate roadAccess P385 FINISHED
Object M18 motorway E357754 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: M18 motorway | Statement: [Hatfield, Yorkshire, roadAccess, M18 motorway]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: M18 motorway
Context triple: [Hatfield, Yorkshire, roadAccess, M18 motorway]
  • A. M18 motorway chosen
    The M18 motorway is a major road in England linking the M1 near Rotherham to the M62 near Goole, providing a key route between South Yorkshire and the Humber region.
  • B. M11 motorway
    The M11 motorway is a major road in England connecting London to Cambridge and serving as a key route for traffic between the capital, East Anglia, and the Midlands via the A14.
  • C. M8 motorway
    The M8 motorway is a major Scottish highway linking the cities of Glasgow and Edinburgh and serving as a key east–west transport corridor across the Central Belt.
  • D. M8 motorway
    The M8 motorway is a major Irish highway linking Cork to Dublin, forming a key part of the country’s primary inter-urban road network.
  • E. M90 motorway
    The M90 motorway is a major Scottish highway linking Edinburgh to Perth and serving as a key north–south route in eastern Scotland.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8076e64308190904fb5c93517c901 completed April 9, 2026, 8:09 p.m.
NER Named-entity recognition batch_69d98050157c8190bb8c640b759ac2b7 completed April 10, 2026, 10:57 p.m.
NED1 Entity disambiguation (via context triple) batch_6a008a1d8e088190a2168952ab5dc687 completed May 10, 2026, 1:37 p.m.
Created at: April 9, 2026, 8:56 p.m.