Triple
T13021808
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Avonmouth Bridge |
E326189
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | steel box girder bridge |
C21727
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: steel box girder bridge Context triple: [Avonmouth Bridge, instanceOf, steel box girder bridge]
-
A.
box girder bridge
chosen
A box girder bridge is a type of bridge whose main load-bearing structure consists of hollow, box-shaped girders that provide high strength and torsional rigidity for spanning medium to long distances.
-
B.
steel arch bridge
A steel arch bridge is a structure that uses a curved steel arch as its main load-bearing element to span a distance and support traffic above.
-
C.
beam bridge
A beam bridge is a simple type of bridge consisting of a horizontal beam supported at its ends by piers or abutments, carrying loads primarily through bending.
-
D.
reinforced-concrete bridge
A reinforced-concrete bridge is a structural system in which concrete and embedded steel reinforcement work together to safely carry and distribute loads across a span.
-
E.
reinforced-concrete bridge
A reinforced-concrete bridge is a structural system in which concrete and embedded steel reinforcement work together to safely span obstacles and carry traffic loads over a defined distance.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8076cc45c81908123123f43e69266 |
completed | April 9, 2026, 8:09 p.m. |
Created at: April 9, 2026, 8:52 p.m.