Triple

T12969868
Position Surface form Disambiguated ID Type / Status
Subject Colorado River Basin E321362 entity
Predicate hasMajorDam P8736 FINISHED
Object Parker Dam E96965 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Parker Dam | Statement: [Colorado River Basin, hasMajorDam, Parker Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Parker Dam
Context triple: [Colorado River Basin, hasMajorDam, Parker Dam]
  • A. Parker Dam chosen
    Parker Dam is a concrete arch-gravity dam on the Colorado River best known for creating Lake Havasu and supplying water and hydroelectric power to parts of California and Arizona.
  • B. East Park Dam
    East Park Dam is an early 20th-century concrete arch dam in Colusa County, California, built as part of the Orland Project to provide irrigation water storage and flood control.
  • C. Waddell Dam
    Waddell Dam is a major dam in Arizona that impounds the Agua Fria River to form Lake Pleasant, a key water storage and recreation reservoir for the Phoenix metropolitan area.
  • D. Gillespie Dam
    Gillespie Dam is an early 20th-century concrete gravity dam on Arizona’s Gila River, historically used for irrigation and now noted as a local landmark and wildlife habitat area.
  • E. McClure Dam
    McClure Dam is a hydroelectric dam on the Dead River in Michigan, forming McClure Basin and providing power and water management for the surrounding region.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d80763bd6c819094437da5b20b01d2 completed April 9, 2026, 8:09 p.m.
NER Named-entity recognition batch_69d97e407e5081909424fc0c22483c28 completed April 10, 2026, 10:48 p.m.
NED1 Entity disambiguation (via context triple) batch_69fe0ccb9c3481908820f7620102e373 completed May 8, 2026, 4:18 p.m.
Created at: April 9, 2026, 8:34 p.m.