Triple

T12900377
Position Surface form Disambiguated ID Type / Status
Subject Magit E308596 entity
Predicate instanceOf P0 FINISHED
Object Git interface C32052 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Git interface
Context triple: [Magit, instanceOf, Git interface]
  • A. command-line interface
    A command-line interface is a text-based user interface that allows users to interact with a computer system by typing commands and receiving textual output.
  • B. Git repository hosting service
    A Git repository hosting service is an online platform that stores, manages, and facilitates collaboration on Git-based source code repositories, providing features like version control, access control, issue tracking, and integration with development tools.
  • C. interface
    An interface is an abstract contract that defines a set of methods or behaviors a class must implement without specifying how those behaviors are carried out.
  • D. web-based interface
    A web-based interface is an interactive front-end system accessed through a web browser that allows users to view, input, and manipulate information over the internet.
  • E. open source software interface
    An open source software interface is a publicly accessible set of interaction points, such as APIs or user interfaces, whose underlying code is openly available for use, modification, and distribution under an open source license.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d7bdf7c1f0819098102569a8d8cbf5 completed April 9, 2026, 2:55 p.m.
Created at: April 9, 2026, 5:40 p.m.