Triple

T12869846
Position Surface form Disambiguated ID Type / Status
Subject Walk the Line E307818 entity
Predicate productionCompany P490 FINISHED
Object Konrad Pictures E868772 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Konrad Pictures | Statement: [Walk the Line, productionCompany, Konrad Pictures]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Konrad Pictures
Context triple: [Walk the Line, productionCompany, Konrad Pictures]
  • A. Konrad Pictures chosen
    Konrad Pictures is a film production company known for working on the romantic fantasy movie "Kate & Leopold."
  • B. Monumental Pictures
    Monumental Pictures is a British film and television production company known for producing high-profile dramas such as the period series "Harlots."
  • C. Monumental Pictures
    Monumental Pictures is a British film and television production company known for producing feature films such as the 2019 adaptation of "Cats."
  • D. Monumental Pictures
    Monumental Pictures is the fictional Hollywood film studio featured in the classic musical film "Singin' in the Rain."
  • E. Vistar Films
    Vistar Films is a film production company best known for its involvement in the making of the 1985 horror-comedy classic "Fright Night."
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d7bdf69bc48190af6c2621f28ca351 completed April 9, 2026, 2:55 p.m.
NER Named-entity recognition batch_69d970905784819091631161a9de98c5 completed April 10, 2026, 9:50 p.m.
NED1 Entity disambiguation (via context triple) batch_69f6af533d188190b9c816cdc892fe99 completed May 3, 2026, 2:13 a.m.
Created at: April 9, 2026, 5:38 p.m.