Triple

T12836832
Position Surface form Disambiguated ID Type / Status
Subject Washington State Route 525 E306938 entity
Predicate terminusSouth P1866 FINISHED
Object Interstate 5 in Lynnwood
Interstate 5 in Lynnwood is a major north–south freeway segment in Washington state that serves as a key transportation corridor connecting the city of Lynnwood with the greater Seattle metropolitan area and beyond.
E1005172 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Interstate 5 in Lynnwood | Statement: [Washington State Route 525, terminusSouth, Interstate 5 in Lynnwood]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Interstate 5 in Lynnwood
Context triple: [Washington State Route 525, terminusSouth, Interstate 5 in Lynnwood]
  • A. Interstate 5 in Federal Way
    Interstate 5 in Federal Way is a major segment of the primary north–south interstate highway in Washington State, serving as a key transportation corridor through the city of Federal Way between Seattle and Tacoma.
  • B. Interstate 5 in Seattle
    Interstate 5 in Seattle is a major north–south freeway corridor running through the heart of Seattle, serving as a key route for regional and interstate traffic along the U.S. West Coast.
  • C. Interstate 5 in Vancouver, Washington
    Interstate 5 in Vancouver, Washington is a major north–south freeway segment of the West Coast’s primary interstate corridor, connecting the city to Portland, Oregon across the Columbia River and to the broader I-5 route through Washington state.
  • D. Interstate 5 in Tacoma, Washington
    Interstate 5 in Tacoma, Washington is a major north–south freeway corridor that carries regional and interstate traffic through the Tacoma area, connecting it to Seattle, Olympia, and the broader West Coast I-5 route.
  • E. Interstate 5 in Chehalis, Washington
    Interstate 5 in Chehalis, Washington is a major north–south freeway segment of the West Coast’s primary interstate corridor, serving as a key transportation route through the city and connecting it to regional and interstate destinations.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Interstate 5 in Lynnwood
Triple: [Washington State Route 525, terminusSouth, Interstate 5 in Lynnwood]
Generated description
Interstate 5 in Lynnwood is a major north–south freeway segment in Washington state that serves as a key transportation corridor connecting the city of Lynnwood with the greater Seattle metropolitan area and beyond.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Interstate 5 in Lynnwood
Target entity description: Interstate 5 in Lynnwood is a major north–south freeway segment in Washington state that serves as a key transportation corridor connecting the city of Lynnwood with the greater Seattle metropolitan area and beyond.
  • A. Interstate 5 in Federal Way
    Interstate 5 in Federal Way is a major segment of the primary north–south interstate highway in Washington State, serving as a key transportation corridor through the city of Federal Way between Seattle and Tacoma.
  • B. Interstate 5 in Seattle
    Interstate 5 in Seattle is a major north–south freeway corridor running through the heart of Seattle, serving as a key route for regional and interstate traffic along the U.S. West Coast.
  • C. Interstate 5 in Vancouver, Washington
    Interstate 5 in Vancouver, Washington is a major north–south freeway segment of the West Coast’s primary interstate corridor, connecting the city to Portland, Oregon across the Columbia River and to the broader I-5 route through Washington state.
  • D. Interstate 5 in Tacoma, Washington
    Interstate 5 in Tacoma, Washington is a major north–south freeway corridor that carries regional and interstate traffic through the Tacoma area, connecting it to Seattle, Olympia, and the broader West Coast I-5 route.
  • E. Interstate 5 in Chehalis, Washington
    Interstate 5 in Chehalis, Washington is a major north–south freeway segment of the West Coast’s primary interstate corridor, serving as a key transportation route through the city and connecting it to regional and interstate destinations.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d7bdf52b94819096d6f0ba4ab50a98 completed April 9, 2026, 2:55 p.m.
NER Named-entity recognition batch_69d96ff015f4819090070a01f3938acc completed April 10, 2026, 9:47 p.m.
NED1 Entity disambiguation (via context triple) batch_69f68edaa6288190a775f6e852fa941b completed May 2, 2026, 11:55 p.m.
NEDg Description generation batch_69f6900385548190befe667dc4e33af9 completed May 3, 2026, midnight
NED2 Entity disambiguation (via description) batch_69f690c0bd208190bd1f04a9640ad1ce completed May 3, 2026, 12:03 a.m.
Created at: April 9, 2026, 5:35 p.m.