Triple

T12791024
Position Surface form Disambiguated ID Type / Status
Subject City Tunnel No. 1 E305759 entity
Predicate instanceOf P0 FINISHED
Object municipal water tunnel C8199 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: municipal water tunnel
Context triple: [City Tunnel No. 1, instanceOf, municipal water tunnel]
  • A. water supply tunnel chosen
    A water supply tunnel is an underground passage constructed to convey water from its source to treatment facilities, storage reservoirs, or distribution networks, often over long distances and through challenging terrain.
  • B. canal aqueduct
    A canal aqueduct is a bridge-like structure that carries a navigable waterway over obstacles such as rivers, valleys, roads, or other canals.
  • C. municipal water supply facility
    A municipal water supply facility is an infrastructure complex that sources, treats, stores, and distributes potable water to meet the needs of a community or city.
  • D. New York City water tunnel
    A New York City water tunnel is a large underground aqueduct system that transports potable water from upstate reservoirs to the city’s distribution network.
  • E. transportation tunnel
    A transportation tunnel is an underground or enclosed passageway designed to allow vehicles, trains, or pedestrians to travel safely through or beneath natural or man-made obstacles.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d7bdf366888190a8cccb982606889c completed April 9, 2026, 2:55 p.m.
Created at: April 9, 2026, 5:30 p.m.