Triple

T12632773
Position Surface form Disambiguated ID Type / Status
Subject Shinjuku ALTA Vision screen E301684 entity
Predicate instanceOf P0 FINISHED
Object digital billboard C6813 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: digital billboard
Context triple: [Shinjuku ALTA Vision screen, instanceOf, digital billboard]
  • A. mechanical billboard
    A mechanical billboard is a large outdoor advertising structure that uses moving parts or rotating panels to display one or more changing visual messages.
  • B. outdoor advertisement chosen
    An outdoor advertisement is a public-facing promotional display, such as billboards, posters, or digital screens, placed in open-air environments to communicate marketing messages to passersby.
  • C. outdoor advertising sign
    An outdoor advertising sign is a permanent or semi-permanent structure placed in exterior public or private spaces to display promotional, informational, or directional messages to passing audiences.
  • D. signage system
    A signage system is an organized set of visual elements and standards used to guide, inform, and direct people within physical or digital environments.
  • E. digital advertising specification
    A digital advertising specification is a formal document that defines the technical, creative, and delivery requirements for digital ad formats to ensure consistent implementation, compatibility, and performance across platforms and systems.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d7bdec9f9c8190b4bac675b7588211 completed April 9, 2026, 2:55 p.m.
Created at: April 9, 2026, 5:15 p.m.