Triple
T12528722
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Aquapolis floating city |
E299503
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | experimental marine city |
C29740
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: experimental marine city Context triple: [Aquapolis floating city, instanceOf, experimental marine city]
-
A.
floating city
chosen
A floating city is a self-sustaining urban settlement built on buoyant or airborne platforms that drift or hover above land or sea.
-
B.
oceanographic research pier
An oceanographic research pier is a specialized coastal structure extending into the sea, equipped with instruments and facilities that allow scientists to conduct long-term, in situ studies of marine and atmospheric processes.
-
C.
marina
A marina is a specialized harbor facility that provides moorings, services, and amenities for recreational and small commercial boats and yachts.
-
D.
oceanarium
An oceanarium is a large marine facility that houses and displays diverse ocean life in expansive, often open-ocean–simulating tanks for education, research, and public viewing.
-
E.
marine ecosystem
A marine ecosystem is a complex, interconnected community of organisms, physical environments, and chemical processes in ocean and sea waters that interact to sustain life and energy flow.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6ada5cdd48190860d9ce30aff69be |
completed | April 8, 2026, 7:33 p.m. |
Created at: April 8, 2026, 9:57 p.m.