Triple
T12528721
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Aquapolis floating city |
E299503
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | floating structure |
C29740
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: floating structure Context triple: [Aquapolis floating city, instanceOf, floating structure]
-
A.
floating market
A floating market is a marketplace where vendors sell goods, often fresh produce and local foods, directly from boats on rivers or canals.
-
B.
floating lighthouse
A floating lighthouse is a buoyant navigational structure that drifts or is moored at sea while emitting light signals to guide vessels and mark hazards.
-
C.
floating city
chosen
A floating city is a self-sustaining urban settlement built on buoyant or airborne platforms that drift or hover above land or sea.
-
D.
floating national park
A floating national park is a protected natural area situated on water-based platforms or vessels, designed to conserve aquatic and nearby terrestrial ecosystems while remaining mobile on lakes, rivers, or oceans.
-
E.
maritime structure
A maritime structure is a man-made construction located in or near bodies of water, designed to support marine activities such as navigation, transportation, resource extraction, or coastal protection.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6ada5cdd48190860d9ce30aff69be |
completed | April 8, 2026, 7:33 p.m. |
Created at: April 8, 2026, 9:57 p.m.