Triple
T12506205
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Ligerz–Prêles funicular |
E298954
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | hillside cable railway |
C1080
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: hillside cable railway Context triple: [Ligerz–Prêles funicular, instanceOf, hillside cable railway]
-
A.
mountain rack railway
A mountain rack railway is a steep-gradient railway system that uses a toothed rack rail engaged by a cogwheel on the train to provide additional traction and braking on mountainous terrain.
-
B.
cable car system
chosen
A cable car system is a transportation network in which vehicles are pulled by continuously moving cables, typically used to move people or goods along steep or inaccessible routes such as mountainsides or urban hills.
-
C.
cable car station
A cable car station is a designated facility where passengers board, disembark, and transfer between cable-propelled vehicles, typically featuring platforms, ticketing areas, and equipment for operating and maintaining the cable system.
-
D.
cable car pioneer
A cable car pioneer is an innovator who develops, implements, or significantly advances early cable-driven transportation systems for people or goods.
-
E.
cogwheel railway
A cogwheel railway is a type of railway that uses a toothed rack rail engaged by a cogwheel on the train to enable safe operation on steep gradients.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6ada4cd388190ae3bbf83ff87057a |
completed | April 8, 2026, 7:33 p.m. |
Created at: April 8, 2026, 9:57 p.m.