Triple

T12429358
Position Surface form Disambiguated ID Type / Status
Subject Port Imperial E296985 entity
Predicate instanceOf P0 FINISHED
Object ferry terminal complex C6402 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: ferry terminal complex
Context triple: [Port Imperial, instanceOf, ferry terminal complex]
  • A. ferry terminal chosen
    A ferry terminal is a designated facility where passengers and vehicles embark and disembark from ferries, typically providing ticketing, waiting areas, and docking infrastructure.
  • B. waterfront pier complex
    A waterfront pier complex is a multi-use structure extending over the water that integrates docking facilities, public promenades, and commercial or recreational amenities along the shoreline.
  • C. maritime cargo terminal
    A maritime cargo terminal is a specialized facility at a seaport where ships are loaded and unloaded, and cargo is temporarily stored, sorted, and transferred between sea and land transportation modes.
  • D. container terminal complex
    A container terminal complex is a large, integrated facility where containerized cargo is transferred between ships, trucks, and trains, supported by specialized infrastructure, equipment, and logistics services.
  • E. bridge–tunnel complex
    A bridge–tunnel complex is an integrated transportation structure that combines bridge spans and underwater tunnels to carry traffic across wide bodies of water or other large obstacles.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6ada0640c81908c061d7fb3d47786 completed April 8, 2026, 7:33 p.m.
Created at: April 8, 2026, 9:55 p.m.