Triple
T12395213
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Inca tambos |
E296099
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | support facilities |
C10698
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: support facilities Context triple: [Inca tambos, instanceOf, support facilities]
-
A.
support activity
A support activity is an auxiliary function or process that enables, enhances, or maintains an organization’s primary activities by providing necessary resources, infrastructure, or services.
-
B.
support branch
A support branch is a temporary code line created from a stable base to isolate, develop, and deliver urgent fixes or minor updates without disrupting ongoing mainline or feature development.
-
C.
support formation
Support formation is the process of organizing and mobilizing resources, relationships, and structures that provide ongoing assistance, stability, and reinforcement for individuals, groups, or systems.
-
D.
facility
A facility is a physical place or infrastructure designed and equipped to support specific activities, services, or operations.
-
E.
infrastructure facility
chosen
An infrastructure facility is a physical installation or complex that provides essential services or support functions—such as transportation, utilities, communication, or public safety—necessary for the operation and development of a community or region.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6ad9e653c8190b1473c860ee53dae |
completed | April 8, 2026, 7:33 p.m. |
Created at: April 8, 2026, 9:54 p.m.