Triple

T12387307
Position Surface form Disambiguated ID Type / Status
Subject Cambridge, New Zealand E295899 entity
Predicate hasNearbyFeature P350 FINISHED
Object Karapiro Dam E421529 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Karapiro Dam | Statement: [Cambridge, New Zealand, hasNearbyFeature, Karapiro Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Karapiro Dam
Context triple: [Cambridge, New Zealand, hasNearbyFeature, Karapiro Dam]
  • A. Karapiro Dam chosen
    Karapiro Dam is a major hydroelectric dam in New Zealand that forms Lake Karapiro and plays a key role in power generation and water management on the Waikato River.
  • B. Tawa Dam
    Tawa Dam is a major masonry dam in Madhya Pradesh, India, built on the Tawa River for irrigation, flood control, and hydroelectric power generation.
  • C. Rapel Dam
    Rapel Dam is a major hydroelectric and irrigation dam in central Chile that forms the Rapel Reservoir on the Rapel River.
  • D. Pukaki Dam
    Pukaki Dam is a major hydroelectric dam in New Zealand’s South Island that regulates Lake Pukaki as part of the Waitaki River power scheme.
  • E. Arapuni Dam
    Arapuni Dam is a major hydroelectric power station and concrete arch dam on New Zealand’s North Island, contributing significantly to the country’s renewable electricity generation.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6ad9e653c8190b1473c860ee53dae completed April 8, 2026, 7:33 p.m.
NER Named-entity recognition batch_69d93fbd489c819098233a111442762e completed April 10, 2026, 6:21 p.m.
NED1 Entity disambiguation (via context triple) batch_69f68ea3ec588190bca355953267578f completed May 2, 2026, 11:54 p.m.
Created at: April 8, 2026, 9:54 p.m.