Triple

T1238471
Position Surface form Disambiguated ID Type / Status
Subject Grand Bridge E26601 entity
Predicate instanceOf P0 FINISHED
Object ornamental bridge C7122 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: ornamental bridge
Context triple: [Grand Bridge, instanceOf, ornamental bridge]
  • A. covered bridge
    A covered bridge is a typically wooden, roofed structure that spans a waterway or gap, enclosing its roadway to protect the supporting framework from weather and extend its lifespan.
  • B. ceremonial bridge
    A ceremonial bridge is a specially designed structure used primarily for symbolic, ritual, or commemorative crossings during formal events rather than for everyday transportation.
  • C. stone arch bridge
    A stone arch bridge is a structure composed of curved stone arches that span a gap, using the compressive strength of masonry to support loads and provide passage over obstacles like rivers or valleys.
  • D. pedestrian bridge
    A pedestrian bridge is a raised structure designed exclusively for people on foot (and often cyclists) to safely cross obstacles such as roads, railways, or waterways without interacting with vehicular traffic.
  • E. wooden footbridge
    A wooden footbridge is a small, elevated pedestrian crossing made primarily of timber, designed to span obstacles such as streams, ditches, or uneven terrain.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a4948689d08190b3a4a3f388c02148 completed March 1, 2026, 7:33 p.m.
Created at: March 1, 2026, 7:47 p.m.