Triple
T1238471
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Grand Bridge |
E26601
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | ornamental bridge |
C7122
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: ornamental bridge Context triple: [Grand Bridge, instanceOf, ornamental bridge]
-
A.
covered bridge
A covered bridge is a typically wooden, roofed structure that spans a waterway or gap, enclosing its roadway to protect the supporting framework from weather and extend its lifespan.
-
B.
ceremonial bridge
A ceremonial bridge is a specially designed structure used primarily for symbolic, ritual, or commemorative crossings during formal events rather than for everyday transportation.
-
C.
stone arch bridge
A stone arch bridge is a structure composed of curved stone arches that span a gap, using the compressive strength of masonry to support loads and provide passage over obstacles like rivers or valleys.
-
D.
pedestrian bridge
A pedestrian bridge is a raised structure designed exclusively for people on foot (and often cyclists) to safely cross obstacles such as roads, railways, or waterways without interacting with vehicular traffic.
-
E.
wooden footbridge
A wooden footbridge is a small, elevated pedestrian crossing made primarily of timber, designed to span obstacles such as streams, ditches, or uneven terrain.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a4948689d08190b3a4a3f388c02148 |
completed | March 1, 2026, 7:33 p.m. |
Created at: March 1, 2026, 7:47 p.m.