Triple
T1232172
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Kahoʻolawe |
E26466
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | former military bombing range |
C1086
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: former military bombing range Context triple: [Kahoʻolawe, instanceOf, former military bombing range]
-
A.
military installation
chosen
A military installation is a designated facility or area where armed forces are stationed, trained, equipped, and supported to conduct defense and security operations.
-
B.
United States Air Force base
A United States Air Force base is a military installation that supports Air Force operations through facilities for aircraft, personnel, training, logistics, and command and control activities.
-
C.
former industrial plant
A former industrial plant is a decommissioned facility that once housed large-scale manufacturing or processing operations, often leaving behind substantial physical infrastructure and potential environmental impacts.
-
D.
former prison site
A former prison site is a decommissioned correctional facility and its grounds that once housed incarcerated individuals but has since been repurposed, abandoned, or preserved for historical, cultural, or alternative uses.
-
E.
airfield
An airfield is a designated area of land equipped with runways, taxiways, and minimal support facilities for the takeoff, landing, and ground movement of aircraft.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a4948571c88190a9191e451e6035fd |
completed | March 1, 2026, 7:33 p.m. |
Created at: March 1, 2026, 7:47 p.m.