Triple

T12315364
Position Surface form Disambiguated ID Type / Status
Subject Hakarimata Range E293585 entity
Predicate hasTrail P3625 FINISHED
Object Hakarimata Rail Trail
Hakarimata Rail Trail is a scenic walking and cycling track in New Zealand that follows a former railway alignment through the native bush of the Hakarimata Range.
E976552 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Hakarimata Rail Trail | Statement: [Hakarimata Range, hasTrail, Hakarimata Rail Trail]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Hakarimata Rail Trail
Context triple: [Hakarimata Range, hasTrail, Hakarimata Rail Trail]
  • A. Manhan Rail Trail
    Manhan Rail Trail is a multi-use recreational path in western Massachusetts that follows a former rail corridor, popular for walking, running, and cycling.
  • B. Indian Head Rail Trail
    Indian Head Rail Trail is a multi-use recreational path in Charles County, Maryland, converted from a former railroad corridor and popular for walking, running, and cycling.
  • C. Oro-Medonte Rail Trail
    The Oro-Medonte Rail Trail is a recreational multi-use trail in Oro-Medonte, Ontario, that follows a former railway corridor for activities like walking, cycling, and snowmobiling.
  • D. Ashuwillticook Rail Trail
    Ashuwillticook Rail Trail is a scenic multi-use path in western Massachusetts that follows a former railroad corridor along lakes, rivers, and mountain views popular for walking, running, and cycling.
  • E. Subashiri Trail
    The Subashiri Trail is one of the principal climbing routes on Mount Fuji, known for its forested lower sections, volcanic sand runnels, and comparatively less crowded ascent.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Hakarimata Rail Trail
Triple: [Hakarimata Range, hasTrail, Hakarimata Rail Trail]
Generated description
Hakarimata Rail Trail is a scenic walking and cycling track in New Zealand that follows a former railway alignment through the native bush of the Hakarimata Range.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Hakarimata Rail Trail
Target entity description: Hakarimata Rail Trail is a scenic walking and cycling track in New Zealand that follows a former railway alignment through the native bush of the Hakarimata Range.
  • A. Manhan Rail Trail
    Manhan Rail Trail is a multi-use recreational path in western Massachusetts that follows a former rail corridor, popular for walking, running, and cycling.
  • B. Indian Head Rail Trail
    Indian Head Rail Trail is a multi-use recreational path in Charles County, Maryland, converted from a former railroad corridor and popular for walking, running, and cycling.
  • C. Oro-Medonte Rail Trail
    The Oro-Medonte Rail Trail is a recreational multi-use trail in Oro-Medonte, Ontario, that follows a former railway corridor for activities like walking, cycling, and snowmobiling.
  • D. Ashuwillticook Rail Trail
    Ashuwillticook Rail Trail is a scenic multi-use path in western Massachusetts that follows a former railroad corridor along lakes, rivers, and mountain views popular for walking, running, and cycling.
  • E. Subashiri Trail
    The Subashiri Trail is one of the principal climbing routes on Mount Fuji, known for its forested lower sections, volcanic sand runnels, and comparatively less crowded ascent.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6ab6a2b50819082f6aedd32ed608a completed April 8, 2026, 7:24 p.m.
NER Named-entity recognition batch_69d93f05186481909c024a933b4f6c60 completed April 10, 2026, 6:18 p.m.
NED1 Entity disambiguation (via context triple) batch_69f61e86d45881909a9a3c09df0b78f1 completed May 2, 2026, 3:55 p.m.
NEDg Description generation batch_69f622a646c481908164ae5387625bb4 completed May 2, 2026, 4:13 p.m.
NED2 Entity disambiguation (via description) batch_69f623f5aa608190bce3e62e08077216 completed May 2, 2026, 4:19 p.m.
Created at: April 8, 2026, 9:53 p.m.