Triple

T12301909
Position Surface form Disambiguated ID Type / Status
Subject Automobile Building at Fair Park E293248 entity
Predicate instanceOf P0 FINISHED
Object Fair Park building C31255 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Fair Park building
Context triple: [Automobile Building at Fair Park, instanceOf, Fair Park building]
  • A. county park
    A county park is a publicly accessible natural or recreational area owned and managed by a county government, providing outdoor spaces, facilities, and activities for community use.
  • B. Bauhaus building
    A Bauhaus building is a structure designed in the early 20th-century Bauhaus style, characterized by functional forms, clean lines, flat roofs, and an emphasis on simplicity, industrial materials, and the integration of art, craft, and technology.
  • C. bayside park
    A bayside park is a public recreational area located along the edge of a bay, typically featuring waterfront views, walking paths, green spaces, and amenities for leisure and outdoor activities.
  • D. Royal Park
    A Royal Park is a large, formally designated public green space historically associated with a monarchy, preserved for recreation, leisure, and ceremonial or cultural events.
  • E. deck park
    A deck park is an elevated public green space constructed over transportation infrastructure, such as highways or rail lines, to reconnect urban areas and provide recreational and environmental benefits.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6ab6a2b50819082f6aedd32ed608a completed April 8, 2026, 7:24 p.m.
Created at: April 8, 2026, 9:53 p.m.