Triple

T1229365
Position Surface form Disambiguated ID Type / Status
Subject Sentrum E26400 entity
Predicate contains P35 FINISHED
Object Jernbanetorget E129278 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Jernbanetorget | Statement: [Sentrum, contains, Jernbanetorget]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Jernbanetorget
Context triple: [Sentrum, contains, Jernbanetorget]
  • A. Jernbanetorget metro station chosen
    Jernbanetorget metro station is a major underground public transport hub in central Oslo, Norway, serving multiple metro lines and connecting with trams, buses, and the main railway station.
  • B. Oslo Bus Terminal
    Oslo Bus Terminal is the main long-distance and regional bus hub in Oslo, Norway, connecting the city with domestic and international destinations.
  • C. Nationaltheatret station
    Nationaltheatret station is a major underground transport hub in central Oslo that serves both metro and railway lines, connecting key parts of the city and surrounding region.
  • D. Stortinget metro station
    Stortinget metro station is a central underground station in Oslo’s metro system, serving as a major hub for lines running through the city center.
  • E. Sporveien
    Sporveien is the municipally owned public transport company in Oslo that operates key parts of the city's metro, tram, and bus infrastructure.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a4948571c88190a9191e451e6035fd completed March 1, 2026, 7:33 p.m.
NER Named-entity recognition batch_69a4be3dac2c8190914ff27173bb6b34 completed March 1, 2026, 10:31 p.m.
NED1 Entity disambiguation (via context triple) batch_69ac93bf346081908a36a25b6616009a completed March 7, 2026, 9:08 p.m.
Created at: March 1, 2026, 7:47 p.m.