Triple

T12267141
Position Surface form Disambiguated ID Type / Status
Subject Tillamook Bay tidal wetlands E292376 entity
Predicate instanceOf P0 FINISHED
Object tidal wetland complex C4013 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: tidal wetland complex
Context triple: [Tillamook Bay tidal wetlands, instanceOf, tidal wetland complex]
  • A. wetland chosen
    A wetland is a transitional ecosystem between terrestrial and aquatic environments characterized by saturated soils, standing or slow-moving water, and vegetation adapted to waterlogged conditions.
  • B. estuary
    An estuary is a coastal water body where freshwater from rivers and streams mixes with saltwater from the ocean, creating a dynamic and nutrient-rich environment.
  • C. tidal creek
    A tidal creek is a narrow, shallow waterway in coastal or estuarine areas whose flow and water level are strongly influenced by the rise and fall of the tides.
  • D. restored wetland
    A restored wetland is a previously degraded or altered wetland area that has been intentionally rehabilitated to recover its natural hydrology, vegetation, and ecological functions.
  • E. riverine sanctuary
    A riverine sanctuary is a protected natural area centered around a river and its surrounding ecosystems, preserving aquatic and riparian habitats while supporting biodiversity and sustainable human use.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6ab6856488190b5d31178d5015f8e completed April 8, 2026, 7:24 p.m.
Created at: April 8, 2026, 9:52 p.m.