Triple

T12205649
Position Surface form Disambiguated ID Type / Status
Subject NRX reactor E290828 entity
Predicate successor P78 FINISHED
Object NRU reactor E290829 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: NRU reactor | Statement: [NRX reactor, successor, NRU reactor]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: NRU reactor
Context triple: [NRX reactor, successor, NRU reactor]
  • A. NRU reactor chosen
    The NRU reactor was a Canadian research nuclear reactor at Chalk River Laboratories known for producing medical isotopes and supporting materials testing and reactor physics research.
  • B. S2W nuclear reactor
    The S2W nuclear reactor was an early U.S. Navy pressurized water reactor design that powered the world’s first operational nuclear-powered submarine, USS Nautilus.
  • C. Dimona reactor
    The Dimona reactor is a highly secretive nuclear research facility in Israel widely believed to be central to the country’s undeclared nuclear weapons program.
  • D. IBR-2 reactor
    The IBR-2 reactor is a fast pulsed research nuclear reactor used primarily for neutron scattering experiments in condensed matter physics and materials science.
  • E. PM-3A nuclear reactor
    The PM-3A nuclear reactor was a small U.S. Navy-built nuclear power plant that supplied electricity and heat to McMurdo Station in Antarctica during the 1960s and early 1970s.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6ab65923081909acfc61b7a612233 completed April 8, 2026, 7:24 p.m.
NER Named-entity recognition batch_69d91c7c9084819085e7d2f9038f409f completed April 10, 2026, 3:51 p.m.
NED1 Entity disambiguation (via context triple) batch_69f60a9ae3d48190a220ccd37ce8d3e7 completed May 2, 2026, 2:30 p.m.
Created at: April 8, 2026, 9:51 p.m.