Triple
T12188317
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Judah & 9th Avenue |
E290394
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Muni Metro stop |
C2851
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Muni Metro stop Context triple: [Judah & 9th Avenue, instanceOf, Muni Metro stop]
-
A.
light-rail station
chosen
A light-rail station is a designated facility where light-rail vehicles stop to allow passengers to board, alight, and transfer between services, typically featuring platforms, shelters, signage, and ticketing amenities.
-
B.
Tren Urbano station
A Tren Urbano station is a designated facility along the Tren Urbano rapid transit system where passengers access, board, and alight trains, typically featuring platforms, ticketing areas, and related transit amenities.
-
C.
MBTA Silver Line station
An MBTA Silver Line station is a designated stop or terminal along Boston’s Silver Line bus rapid transit routes, providing passenger access to boarding, alighting, and related transit services.
-
D.
São Paulo Metro station
A São Paulo Metro station is a designated public transit facility within the São Paulo Metro system where passengers access, board, and transfer between metro trains.
-
E.
MARC station
A MARC station is a designated passenger rail stop along the Maryland Area Regional Commuter (MARC) train network, providing boarding, alighting, and related services for regional commuters.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6ab64de5881908d56eb7a75c6cc69 |
completed | April 8, 2026, 7:24 p.m. |
Created at: April 8, 2026, 9:50 p.m.