Triple

T12175449
Position Surface form Disambiguated ID Type / Status
Subject Integrated Science Instrument Module E290075 entity
Predicate developmentLead P40576 FINISHED
Object NASA Goddard Space Flight Center E15372 NE FINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: NASA Goddard Space Flight Center | Statement: [Integrated Science Instrument Module, developmentLead, NASA Goddard Space Flight Center]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: NASA Goddard Space Flight Center
Context triple: [Integrated Science Instrument Module, developmentLead, NASA Goddard Space Flight Center]
  • A. Goddard Space Flight Center chosen
    Goddard Space Flight Center is a major NASA research laboratory in Maryland that leads scientific spacecraft development, Earth and space observation missions, and related technology.
  • B. Goddard Spacecraft Operations Control Center
    The Goddard Spacecraft Operations Control Center is NASA’s primary facility at the Goddard Space Flight Center for monitoring, commanding, and managing the operations of numerous Earth-orbiting and deep-space spacecraft.
  • C. Marshall Space Flight Center
    Marshall Space Flight Center is a major NASA field center in Huntsville, Alabama, responsible for developing space launch systems, propulsion technologies, and other key spaceflight hardware.
  • D. Ames Research Center
    Ames Research Center is a major NASA research facility in California known for its contributions to aeronautics, space exploration, and advanced computing technologies.
  • E. NASA Science Mission Directorate
    The NASA Science Mission Directorate is the division of NASA responsible for planning and overseeing the agency’s science programs and missions that explore Earth, the solar system, and the universe.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: developmentLead
Context triple: [Integrated Science Instrument Module, developmentLead, NASA Goddard Space Flight Center]
  • A. teamLead
    Indicates that one entity serves as the leader or primary coordinator of a team that includes the other entity.
  • B. developmentLedBy chosen
    Indicates that the development of something is directed, managed, or overseen by a particular agent or entity.
  • C. developmentRole
    Indicates that an entity participates in the creation, design, or production of another entity in a specific developmental capacity or function.
  • D. designLead
    Indicates that one entity serves as the primary designer or person in charge of leading the design work for another entity or project.
  • E. leadDeveloperAlias
    Indicates that one entity serves as an alternative or alias name for the lead developer associated with another entity.
  • F. None of above.

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6ab4d6c00819095a9a7c35de83cfb completed April 8, 2026, 7:23 p.m.
NER Named-entity recognition batch_69d91621ca6c81908365732f361aef13 completed April 10, 2026, 3:24 p.m.
NED1 Entity disambiguation (via context triple) batch_69f60a88b8748190a6c95e143f370010 completed May 2, 2026, 2:30 p.m.
PD Predicate disambiguation batch_69d9150e85348190b9b47cda4a17dcd0 completed April 10, 2026, 3:19 p.m.
Created at: April 8, 2026, 9:50 p.m.