Triple

T12165385
Position Surface form Disambiguated ID Type / Status
Subject Sight & Sound E289820 entity
Predicate instanceOf P0 FINISHED
Object BFI publication C1736 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: BFI publication
Context triple: [Sight & Sound, instanceOf, BFI publication]
  • A. UK film programme
    A UK film programme is a curated schedule or listing of films selected for screening at cinemas, festivals, or on television within the United Kingdom, often organized around themes, directors, genres, or events.
  • B. publication chosen
    A publication is a finalized work of content (such as an article, book, or report) that has been formally released and made accessible to an audience through a chosen medium.
  • C. UNESCO publication
    A UNESCO publication is an official document or work produced by the United Nations Educational, Scientific and Cultural Organization to disseminate knowledge, guidelines, research, or policy recommendations in its fields of competence.
  • D. publishing organization
    A publishing organization is an entity that selects, produces, and distributes content such as books, journals, or digital media to reach and inform a target audience.
  • E. cinema journal
    A cinema journal is a periodical publication or personal log dedicated to the critical analysis, documentation, and reflection on films, filmmakers, and cinematic trends.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6ab4d6c00819095a9a7c35de83cfb completed April 8, 2026, 7:23 p.m.
Created at: April 8, 2026, 9:50 p.m.