Triple
T12152801
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Kalpasar project |
E289499
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | proposed dam project |
C30991
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: proposed dam project Context triple: [Kalpasar project, instanceOf, proposed dam project]
-
A.
hydroelectric dam
A hydroelectric dam is a large engineered structure that stores and controls river water to drive turbines and generate electricity while managing water flow and levels.
-
B.
reservoir dam
A reservoir dam is a large engineered barrier built across a watercourse to store and regulate water in an upstream reservoir for purposes such as water supply, flood control, irrigation, and power generation.
-
C.
irrigation dam
An irrigation dam is a barrier constructed across a watercourse to store and regulate water specifically for agricultural use, enabling controlled distribution to fields and crops.
-
D.
water supply dam
A water supply dam is a barrier constructed across a watercourse to store and regulate water primarily for human consumption, irrigation, and other municipal or industrial uses.
-
E.
multipurpose dam
A multipurpose dam is a large engineered barrier built across a river or stream to store and regulate water for multiple uses such as irrigation, hydropower generation, flood control, water supply, and recreation.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6ab4c6710819097a9d228382dde43 |
completed | April 8, 2026, 7:23 p.m. |
Created at: April 8, 2026, 9:49 p.m.