Triple

T1213398
Position Surface form Disambiguated ID Type / Status
Subject Nieuwe Maas E26053 entity
Predicate connectsTo P845 FINISHED
Object Nieuwe Waterweg E18143 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Nieuwe Waterweg | Statement: [Nieuwe Maas, connectsTo, Nieuwe Waterweg]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Nieuwe Waterweg
Context triple: [Nieuwe Maas, connectsTo, Nieuwe Waterweg]
  • A. Nieuwe Waterweg chosen
    Nieuwe Waterweg is a major artificial ship canal in the Netherlands that provides a direct deep-water connection between the North Sea and the port of Rotterdam.
  • B. Haringvlietdam
    Haringvlietdam is a major Dutch storm surge barrier and dam complex that regulates water flow and protects the southwestern Netherlands from flooding as part of the Delta Works.
  • C. Amsterdam–Rhine Canal
    The Amsterdam–Rhine Canal is a major Dutch waterway that connects Amsterdam to the Rhine River, serving as an important route for inland shipping and transport.
  • D. Haringvliet
    Haringvliet is a former estuary in the western Netherlands that now functions as a controlled waterway and nature area connecting the Rhine-Meuse river system to the North Sea.
  • E. Wilhelmina Canal
    The Wilhelmina Canal is a major Dutch waterway in the province of North Brabant, constructed to improve regional shipping and industrial transport connections.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a4948331fc8190b531ac9bec71c491 completed March 1, 2026, 7:33 p.m.
NER Named-entity recognition batch_69a4be024e448190ba263a0cc5cc9cd5 completed March 1, 2026, 10:30 p.m.
NED1 Entity disambiguation (via context triple) batch_69ad014954b08190a787d7e03e503d8d completed March 8, 2026, 4:55 a.m.
Created at: March 1, 2026, 7:46 p.m.