Triple
T1206300
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | St. Lawrence Seaway Management Corporation |
E25896
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | transport infrastructure operator |
C6404
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: transport infrastructure operator Context triple: [St. Lawrence Seaway Management Corporation, instanceOf, transport infrastructure operator]
-
A.
mass transit operator
A mass transit operator is an entity responsible for managing, coordinating, and providing public transportation services such as buses, trains, or subways within a specific region or network.
-
B.
paratransit operator
A paratransit operator is a transportation service provider that offers flexible, demand-responsive rides—often door-to-door—for individuals whose disabilities or mobility limitations prevent them from using standard public transit.
-
C.
private railway company
A private railway company is a non-governmental business entity that owns, operates, or manages rail transport services for passengers and/or freight, typically for profit under regulatory oversight.
-
D.
transportation network company
A transportation network company is a business that uses digital platforms, typically mobile apps, to connect passengers with drivers who provide on-demand transportation services.
-
E.
rail transit
Rail transit is a public transportation system that moves passengers or freight along fixed steel tracks using trains, subways, trams, or light rail vehicles, typically in urban or intercity corridors.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a4942b30f08190a91c60573e16b5ef |
completed | March 1, 2026, 7:31 p.m. |
Created at: March 1, 2026, 7:46 p.m.