Triple

T1197520
Position Surface form Disambiguated ID Type / Status
Subject Deep Space Network E25702 entity
Predicate instanceOf P0 FINISHED
Object ground station network C6199 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: ground station network
Context triple: [Deep Space Network, instanceOf, ground station network]
  • A. ground segment equipment chosen
    Ground segment equipment comprises the terrestrial hardware and software systems that support, control, communicate with, and process data from space-based assets such as satellites.
  • B. ground-based radar system
    A ground-based radar system is a terrestrial installation that emits radio waves and analyzes their reflections to detect, track, and characterize objects or weather phenomena within its coverage area.
  • C. space launch facility
    A space launch facility is a specialized complex equipped with infrastructure, systems, and support services for preparing, launching, and sometimes recovering spacecraft and launch vehicles.
  • D. NASA center
    A NASA center is a major facility or campus operated by the National Aeronautics and Space Administration that conducts research, development, testing, and mission operations in specific areas of aerospace and space exploration.
  • E. NASA field center precursor
    A NASA field center precursor is an early organizational entity, facility, or program that laid the technical, institutional, or infrastructural groundwork for the later establishment of a formal NASA field center.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a49429f5ec8190a6a205eb0ae81e5e completed March 1, 2026, 7:31 p.m.
Created at: March 1, 2026, 7:46 p.m.