Triple

T11954872
Position Surface form Disambiguated ID Type / Status
Subject Teesta Barrage E284524 entity
Predicate partOfProject P10 FINISHED
Object Teesta Barrage Project E284524 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Teesta Barrage Project | Statement: [Teesta Barrage, partOfProject, Teesta Barrage Project]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Teesta Barrage Project
Context triple: [Teesta Barrage, partOfProject, Teesta Barrage Project]
  • A. Teesta Barrage chosen
    Teesta Barrage is a major irrigation and flood-control structure built across the Teesta River, playing a key role in water management and agriculture in the surrounding region.
  • B. Malaprabha River Project
    The Malaprabha River Project is an irrigation and water management scheme in Karnataka, India, centered on harnessing the Malaprabha River through dams and reservoirs to support agriculture and regional development.
  • C. Chambal Valley Project
    The Chambal Valley Project is a major multipurpose river development scheme in India focused on irrigation, power generation, and flood control along the Chambal River.
  • D. Ujh Multipurpose Project
    The Ujh Multipurpose Project is a planned Indian infrastructure scheme aimed at harnessing the waters of the Ujh River for irrigation, drinking water supply, and hydroelectric power generation.
  • E. Teesta V Hydroelectric Project
    Teesta V Hydroelectric Project is a major hydroelectric power station in Sikkim, India, harnessing the Teesta River to generate electricity for the region.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6ab2db38c8190b1f0ed6663ef8ada completed April 8, 2026, 7:23 p.m.
NER Named-entity recognition batch_69d90366fda8819083168c93abad27d4 completed April 10, 2026, 2:04 p.m.
NED1 Entity disambiguation (via context triple) batch_69f459175f808190974ac70431f35c74 completed May 1, 2026, 7:41 a.m.
Created at: April 8, 2026, 9:45 p.m.