Triple
T11941012
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Sacramento River watershed infrastructure |
E284176
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | irrigation infrastructure system |
C27395
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: irrigation infrastructure system Context triple: [Sacramento River watershed infrastructure, instanceOf, irrigation infrastructure system]
-
A.
irrigation dam
An irrigation dam is a barrier constructed across a watercourse to store and regulate water specifically for agricultural use, enabling controlled distribution to fields and crops.
-
B.
canal infrastructure
Canal infrastructure encompasses the engineered systems, structures, and facilities—such as channels, locks, dams, embankments, and control mechanisms—designed to manage and support waterborne transport, irrigation, drainage, and water regulation along artificial waterways.
-
C.
levee system
A levee system is an integrated network of embankments, floodwalls, and related structures designed to contain or redirect water to protect land and infrastructure from flooding.
-
D.
water infrastructure
chosen
Water infrastructure encompasses the systems, facilities, and networks designed to source, treat, store, distribute, and manage water and wastewater for human, industrial, and environmental needs.
-
E.
drinking water infrastructure
Drinking water infrastructure comprises the interconnected systems, facilities, and technologies used to source, treat, store, and distribute safe potable water to consumers.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6ab2db38c8190b1f0ed6663ef8ada |
completed | April 8, 2026, 7:23 p.m. |
Created at: April 8, 2026, 9:45 p.m.