Triple
T11939793
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Yonge Street subway corridor |
E284144
|
entity |
| Predicate | isBuiltAlong |
P49363
|
FINISHED |
| Object | Yonge Street right-of-way |
E284144
|
NE FINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Yonge Street right-of-way | Statement: [Yonge Street subway corridor, isBuiltAlong, Yonge Street right-of-way]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Yonge Street right-of-way Context triple: [Yonge Street subway corridor, isBuiltAlong, Yonge Street right-of-way]
-
A.
Yonge Street subway corridor
chosen
The Yonge Street subway corridor is a major rapid transit route in Toronto that follows Yonge Street and forms the backbone of the city’s subway network.
-
B.
Eglinton Avenue East
Eglinton Avenue East is a major arterial road in Toronto that runs east–west through several neighbourhoods, including East York, serving as a key commuter and transit corridor.
-
C.
Avenue Road (Toronto)
Avenue Road is a major north–south arterial street in Toronto, Ontario, known for running through affluent residential neighborhoods and serving as a key route between the city’s downtown and its northern districts.
-
D.
Eglinton Avenue West
Eglinton Avenue West is a significant east–west arterial road in Toronto known for connecting multiple neighborhoods and serving as a key commercial and transit corridor.
-
E.
Colonel By Drive
Colonel By Drive is a scenic parkway in Ottawa, Ontario, running along the Rideau Canal and serving as a major route for commuters and recreational users.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: isBuiltAlong Context triple: [Yonge Street subway corridor, isBuiltAlong, Yonge Street right-of-way]
-
A.
builtAlongside
chosen
Indicates that one entity was constructed next to or in parallel with another entity, typically during the same or a closely related time period.
-
B.
locatedAlong
Indicates that one entity is situated adjacent to, or running beside, the length or course of another linear feature (such as a road, river, or railway).
-
C.
isBuildingOf
Indicates that one entity is a building that belongs to, houses, or is associated with another entity (such as an organization, institution, or complex).
-
D.
definedAlong
Indicates that one entity is specified, established, or determined in relation to the course, boundary, or extent of another entity.
-
E.
builtNear
Indicates that one entity was constructed at a location geographically close to another entity.
- F. None of above.
Provenance (4 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6ab2ce9c48190b5d39511b524f666 |
completed | April 8, 2026, 7:23 p.m. |
| NER | Named-entity recognition | batch_69d903415d2481909d84e6727454b9fe |
completed | April 10, 2026, 2:03 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69f4409a40dc81909d87c50601b98b78 |
completed | May 1, 2026, 5:56 a.m. |
| PD | Predicate disambiguation | batch_69d8bb3af0188190bfb22be5c97b3349 |
completed | April 10, 2026, 8:56 a.m. |
Created at: April 8, 2026, 9:45 p.m.