Triple

T11938362
Position Surface form Disambiguated ID Type / Status
Subject Interstate 69 E284108 entity
Predicate hasSpur P3377 FINISHED
Object Interstate 69E NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Interstate 69E | Statement: [Interstate 69, hasSpur, Interstate 69E]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Interstate 69E
Context triple: [Interstate 69, hasSpur, Interstate 69E]
  • A. Interstate 69E chosen
    Interstate 69E is a U.S. Interstate Highway in South Texas that serves as a major north–south route connecting the Rio Grande Valley region to the broader Interstate 69 corridor.
  • B. Interstate 69
    Interstate 69 is a major north–south U.S. highway that runs through multiple states in the Midwest and South, serving as an important regional and interstate transportation route.
  • C. Interstate 269
    Interstate 269 is a beltway freeway that forms part of the outer loop around the Memphis metropolitan area, improving regional connectivity and bypassing urban traffic.
  • D. Interstate 73
    Interstate 73 is a north–south U.S. Interstate Highway that runs through several states in the eastern United States, including North Carolina.
  • E. Interstate 369
    Interstate 369 is a planned auxiliary Interstate highway in Texas intended to serve as a spur of Interstate 69, improving regional connectivity and access.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6ab2ce9c48190b5d39511b524f666 completed April 8, 2026, 7:23 p.m.
NER Named-entity recognition batch_69d903094218819092e11b273d87de65 completed April 10, 2026, 2:02 p.m.
Created at: April 8, 2026, 9:45 p.m.