Triple
T11930741
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Route 11 (New Brunswick) |
E283902
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | controlled-access highway (in sections) |
C3932
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: controlled-access highway (in sections) Context triple: [Route 11 (New Brunswick), instanceOf, controlled-access highway (in sections)]
-
A.
controlled-access highway
chosen
A controlled-access highway is a high-speed road designed for uninterrupted traffic flow, featuring limited entry and exit points via ramps, no at-grade intersections, and restrictions on pedestrian and non-motorized access.
-
B.
highway segment
A highway segment is a continuous portion of a highway between two defined endpoints, such as interchanges, intersections, or mile markers, characterized by consistent physical and operational attributes.
-
C.
high-occupancy toll lanes
High-occupancy toll lanes are special highway lanes that allow vehicles with multiple occupants to travel for free or at reduced cost while single-occupant vehicles can use them by paying a variable toll designed to manage congestion and maintain faster traffic flow.
-
D.
elevated expressway
An elevated expressway is a high-capacity roadway built on raised structures above ground level to allow uninterrupted traffic flow over urban streets, railways, or other obstacles.
-
E.
highway
A highway is a major public road designed for high-speed, long-distance vehicular travel, typically featuring multiple lanes, limited access points, and safety infrastructure.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6ab2ce9c48190b5d39511b524f666 |
completed | April 8, 2026, 7:23 p.m. |
Created at: April 8, 2026, 9:45 p.m.