Triple

T11929921
Position Surface form Disambiguated ID Type / Status
Subject Do 217K E283882 entity
Predicate successorVariant P16897 FINISHED
Object Do 217M E285039 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Do 217M | Statement: [Do 217K, successorVariant, Do 217M]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Do 217M
Context triple: [Do 217K, successorVariant, Do 217M]
  • A. Do 217M chosen
    The Do 217M was a late-war variant of the German Dornier Do 217 bomber, featuring more powerful engines and improvements for enhanced performance in medium- and high-altitude operations during World War II.
  • B. Do 217E
    The Do 217E was a major bomber variant of the German Dornier Do 217, used extensively by the Luftwaffe during World War II for medium- and long-range bombing missions.
  • C. Do 217K
    The Do 217K was a major production variant of the German Dornier Do 217 bomber, featuring an extensively redesigned forward fuselage and improved performance for medium- and high-altitude operations during World War II.
  • D. Do 17M
    The Do 17M was a German Dornier Do 17 "Flying Pencil" bomber variant developed in the late 1930s with improved performance and payload capacity for Luftwaffe operations.
  • E. M27
    M27 is a major motorway in southern England that connects the New Forest area with Portsmouth and serves as a key route along the south coast.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6ab2ce9c48190b5d39511b524f666 completed April 8, 2026, 7:23 p.m.
NER Named-entity recognition batch_69d90303a9a88190a4044e6310ba9b4b completed April 10, 2026, 2:02 p.m.
NED1 Entity disambiguation (via context triple) batch_69f4406ee910819093c72738bfe3f92c completed May 1, 2026, 5:55 a.m.
Created at: April 8, 2026, 9:45 p.m.